Developed as part of the second phase of corridor development across a 314-hectare area, the 4 Kilo–Entoto Corridor project has been officially inaugurated and opened for service. Under this infrastructure upgrade, the road width was expanded from 32 meters to 42 meters, alongside the addition of a 3-meter bicycle lane, 11.4 kilometers of pedestrian walkways with widths ranging from 5 to 13 meters, 11 designated bus and taxi loading/unloading zones, 7 parking facilities, 2 transport terminals (including a modern shopping mall), and 417 smart lighting poles.